Please find some example Case Studies below:

 

Bournemouth University and Huawei UPS5000E 120kW UPS System

The project required a single frame 100kVA UPS that could be expanded to 200kVA if required and use of the existing UPS battery (3x32Ah strings) and battery stand.

The new UPS had to integrate into the existing electrical infrastructure, building management, fire suppression and air conditioning systems.

More...

 

Server Choice Welwyn Garden City “SC-2” Data Centre

ServerChoice already ran an existing Tier 2+ standard data centre, SC-1, at a site elsewhere in Hertfordshire and wanted to build a new data centre to meet demand for their growing services. 

The new SC-2 data centre was to go beyond this and be truly world-class, by being built to Uptime Institutes Tier 4 standards.  These types of facilities incorporate higher levels of resilience in critical power, cooling and data systems and are more complex and expensive to build.

More...

 

S&C Electric Europe Limited Fire Suppression System

Thamesgate has supplied an inert gas fire suppression and H2 gas detection system for Europe’s largest lithium-ion battery storage project in Leighton Buzzard, Bedfordshire, announced the company. 

The fully automated Smarter Network Storage (SNS) project is a 6MW/10MWh battery substation.  S&C Electric Europe enlisted the services of Thamesgate to design, install and commission the fire suppression system. 

Thamesgate had previously worked with S&C on another major battery storage installation in Scotland and was chosen to supply the fire suppression and detection system at Leighton Buzzard.

More...